Estes Park
A few years ago, the voters of Carrboro approved a couple million dollar bond issue to build sidewalks in various locations around Carrboro. One of the projects on the list was a sidewalk on the south side of Estes Drive Extension from the railroad tracks to North Greensboro Street. But the sidewalk bond money has not gone as far as people had hoped. Considerably higher engineering, materials, labor, drainage and utility-relocation costs have cropped up and we will not be able to build the entire original list of sidewalks with the bond money. Also, in the intervening years, the Town annexed neighborhoods on the west side of Rogers Road and it became apparent that Rogers Road was a place that needed a sidewalk, but had not been on the list before because it was not within town limits.
I imagine many OP readers have heard about area residents who are concerned about the new fence blocking access between Estes Park Apartments in Carrboro and Village West Townhouses in Chapel Hill. The management of Estes Park erected a fence and gate which is padlocked. The fence is 8' tall with three strands of barbed wire at the top. It blocks a traditional connection between the two neighborhoods and by extension connections from each neighborhood to downtown Carrboro and Chapel Hill.
About Us
OrangePolitics is a not-for-profit website for discussing progressive perspectives on politics, planning, and public policy in Orange County, NC. Opinions are those of their authors. Learn more.
Community Guidelines
By using this site, you agree to our community guidelines. Inappropriate or disruptive behavior will result in moderation or eviction.
Zircon - This is a contributing Drupal Theme
Design by
WeebPal.